📚 CBSE Grade-10 Study Guide Open in the Study Guide single page app →
HomeEnglish Language & Literature

English Language & Literature — CBSE Class 10 board question

Q1. [5]
You are Shereen / Shivaji. There has been a lot of construction going on in your colony since the past few months. However the contractors do not follow any protocols of timings, blocking pavements with building material and dumping the rubble in the back lanes and sewage pipes. Write a letter to the President of your RWA drawing attention to these issues. Suggest a set of protocols to be followed by the builders to reduce any inconvenience being caused to the neighbouring residents.
Previously asked in CBSE board exam
2026 2/4/1 Q4(b)
Generated by claude-sonnet-4-6 · 2026-06-15 07:08 · grounding rag
Model Answer

12, Green Park Colony
New Delhi – 110016
15 July 20XX

The President
Residents' Welfare Association
Green Park Colony

Subject: Issues caused by ongoing construction and request for protocols

Respected Sir/Madam,

I wish to bring to your attention the serious inconvenience caused by the rampant construction activity in our colony for the past few months. Contractors are working at odd hours — early mornings and late nights — disturbing residents. Building materials like bricks and sand are dumped on pavements, blocking pedestrian access. Rubble is being thrown into back lanes and sewage pipes, causing blockages and unhygienic conditions.

I humbly request that the RWA enforce the following protocols:

I hope prompt action will be taken.

Yours sincerely,
Shereen

---

Explanation
If a question refers to an image, map, graph or diagram that is not shown here, open the Study Guide single page app, go to Library and find the actual CBSE question paper. The original papers are also available on the CBSE website: cbse.gov.in.
Previous-year CBSE Grade 10 board exam questions, organised by subject and chapter, each with a model answer — free to read and print.